25–31 October 2026 2027 entries open 5 November
2027 entries
Race
76km

85% gravel · 15% paved

Climbing
700m
Descent
950m
Max stage time
5:30h
Start
Gwanishi
Finish
Shamwari
Liaison
33km
Climbing
500m
Descent
510m
Start: Pro Men
07:30
Start: Pro Women
07:33
Start: Age Groups
07:45

The Region

Shamwari takes its name from the Shona word for “friend”. Inland from Gqeberha, near the village of Paterson, the 25,000-hectare reserve spans grassland, thicket and river valleys and is home to the Big 5. Its mission is to restore the land to the ecosystem that existed before farming and hunting drove the wildlife out. Riders arrive after the traverse from the Great Karoo into game country, sleep in the final Burn Camp inside the reserve, and close the week with a 94-kilometre loop.

The Route

A day of rare privilege. Riders race 76 kilometres from the open plains into bushveld and sprint for the line at a remote windmill. After a biosecurity stop, the gates of Shamwari Private Game Reserve open for gravel bikes: a 33-kilometre liaison through game country, as rangers keep watch for predators. In camp there is a moment to recover before the festivities: the Night Burn, an after-dark chase under the stars.

The Racing

The penultimate stage is a high-stakes battle over rugged ground. General classification contenders will fight for every second on the punchy climbs, knowing the chances to challenge for the win are running out. The pressure on the leaders will be relentless, and team tactics are likely to play their part ahead of Saturday’s final 94-kilometre test.

Joe Cloete

“We started in 1992, and the whole objective and vision of Shamwari was to rewild this part of the Eastern Cape. For 364 days of the year, you can’t ride here. This is a unique opportunity in a truly special and protected place.”

Joe Cloete, CEO, Shamwari Private Game Reserve

Map and profile

Loading the map…

Stage 6 elevation profile: 76 km, 700 m of climbing
  • Burn Camp
  • Race route
  • Padstal
  • Summit
  • PCToyota Power Climber
  • KMRed Bull KM
  • Technical descent
  • River crossing
  • Railway crossing
  • Finish
  • Paved
  • Gravel
  • Liaison